More About the Project
Before our IndX team of experts began working with the customer, the leading shipbuilder was looking to address a number of areas for improvement in their shipyard and manufacturing processes:
- The customer's entire ship pre-assembly and construction process was based off a pre-determined hull launch date. Flexibility for when to start fabrication of a ship was limited due to this constraint. Any sort of delays (known and unknown) during hull production caused costly issues downstream in the process.
- The flow of physical ship modules within the shipyard varied widely and depended on a number of continuously changing factors, such as workstation availability and storage constraints. Managing these workflows was critical to maintain continuous construction of the modules as well as to keep costs under control.
- Allocation of human resources was a major concern at the shipyard. Accurately scheduling workers on a daily basis proved difficult because the quantity of workers needed per module varied by hour, day and even week, as did what could be executed on specific modules at specific phases of construction.
At the time that we began working with the customer, it took the shipyard approximately 2 years to launch a hull. Because the enterprise based the manufacturing and construction dates for each ship by the hull launch date, it was critical for the customer to be able to evaluate how delays in one part of the process would affect processes downstream. How could they understand whether or not a delay would impact a promised production deadline?
Thanks to our established expertise in manufacturing simulation technologies, the customer partnered with IndX to help leverage plant simulation tools in order to better understand and improve the efficiency of their shipyard and assembly build process. Our IndX experts spent over 2 months gathering data and information covering all of the structures and processes within the complex shipyard. Our team then used Siemens Tecnomatix Plant Simulation software and the data gathered to design and build a complete simulation model of the customer's shipyard, including their entire manufacturing process and workflow.
IndX's Advantage
In the short-term, the simulation model delivered to the customer by IndX provided a virtual environment in which the customer could study their current ship assembly process in order to understand if they would or would not meet their scheduled launch dates. If not, the model also enabled the customer to run "what if" scenarios to identify and evaluate changes which they could then implement in their shipyard in order to improve processes and meet production deadlines. Most importantly, the simulation model for the shipyard is a flexible, living and risk-free digital tool that the customer can augment, modify and leverage in the years to come. As a result of this project, the customer will be able to drive continuous improvements in their shipbuilding processes and products and continue to protect the industry-leading name they have built in the last 100 years.